Case Study
Bletchley Depot (In Progress)
Client
Taylor Woodrow / WMT
GBR-Rail is contracted to Taylor Woodrow to deliver controlled emission toilet (CET) systems to West Midland Trains for their Bletchley Depot.
GBR-Rail design responsibilities of the CET system from the GRIP 4 stage up to GRIP 5 and AFC. 3D modelling forms part of these works.
CET, Sidings and Plantroom:
New EMU sidings to enable a greater number of 5 cars to be stabled at Bletchley TMD and also 2 DMU sidings to be re-modelled.
Carriage Sidings:
Existing high-level walkways to be replaced with ground level access and all associated lighting etc. CET to be upgraded to accommodate Class 730 5 car units.
Anticipated Project Completion – May 2025
Ask Us Anything. Anytime.
For more details about our projects and capabilities please don’t hesitate to get in touch with us.
- GBR Limited, Unit 1A, Kellingley Road, Weeland Park, Knottingley, WF11 8DS
- railenquiries@gbr-price.co.uk
- 0333 7722421