Kingsmoor Depot

Case Study Kingsmoor Depot Client Direct Rail Services (DRS) Tasked with delivering a CET system, train wash, CET retention tank and toilet facilities, GBR-Rail assembled its full range of expertise to deliver a ‘one stop’ turnkey solution for DRS Kingmoor depot, Carlisle. This not only involved mechanical and electrical (M&E) installations and civil works, but also […]

Hitachi Rail Europe Ltd

Case Study Hitachi Rail Europe Ltd Client VolkerFitzpatrick Volkerfitzpatrick appointed GBR-Rail when it needed highly efficient waste management services and fuel systems. The contract was for VolkerFitzpatrick’s client Hitachi Rail Europe Ltd and its North London, Bristol and Swansea depots, and was a key element of the new InterCity Express Programme. This included bespoke equipment for […]

Thameslink Program (TRSP)

Case Study Thameslink Program (TRSP) Client Siemens PLC GBR-Rail has delivered a multi-million contract for controlled emission toilet (CET) systems to Siemens for the Thameslink Program (TRSP). The £6-billion Thameslink Program includes a major network expansion of central London stations including Blackfriars, Farringdon and London Bridge.  This is part of the government’s commitment to introduce an […]

Bletchley Depot (In Progress)

Case Study Bletchley Depot (In Progress) Client Taylor Woodrow / WMT GBR-Rail is contracted to Taylor Woodrow to deliver controlled emission toilet (CET) systems to West Midland Trains for their Bletchley Depot. GBR-Rail design responsibilities of the CET system from the GRIP 4 stage up to GRIP 5 and AFC. 3D modelling forms part of these […]

Sydney Metro Northwest

Case Study Sydney Metro Northwest Client Northwest Rapid Transit (NRT) GBR-Rail was awarded a contract by the Northwest Rapid Transit (NRT) consortium to design and manufacture a sophisticated, automatic water-recycling carriage wash system for the AU$ 8.3billion Sydney Metro Northwest project – Australia’s biggest public transport undertaking. Sydney Metro Northwest is the first stage of Sydney […]

IEP – Craigentinny Depot

Case Study IEP – Craigentinny Depot Client Spencer Group GBR-Rail has completed a new carriage wash plant for Spencer Group at Craigentinny depot, under Hitachi Rail Europe’s Intercity Express. The project was part of a major rail depot upgrade at Craigentinny, Scotland’s biggest depot by far. Built in 1914 as a carriage servicing depot, it was […]

Greater Anglia carriage wash machine renewal/refurbishment

Case Study Greater Anglia carriage wash machine renewal/refurbishment Client Abellio Greater Anglia GBR contracted to Refurbish and Replace ‘life expired’ Carriage Wash plants by Greater Anglia for their New Trains Improvement Programme at Clacton, Colchester, Ilford, Orient Way and Southend Victoria for Bombardier Class 720 Aventra and Stadler Class 745 and Class 755 Bi-mode trains. […]

What are you looking for?